Upgrading Projects

Project Background

The original production line had a high failure rate, low operating rate, and substandard production capacity.

drtf (9)gfydrtf (8)vax

Project Details

Project

Upgrading of old production line

Installation date

05.2022

Design scale

1500 t/h         Finished size less than 10mm

Workding hours

20 hours/day

Production process

Three stages and one closed circuit crushing process

Equipment list

Process

Equipment

Before upgrading 

After upgrading

Model

Number

Model

Number

Middle crushing

Single cylinder hydraulic cone crusher

CC400-EC

Three sets

HC6800-EC

Two sets

HC870-MF

One set

Fine Crushing

Single cylinder hydraulic cone crusher

CC400-EF

Six sets

HC6800-EF

Five sets

HC870-EF

Two sets

After Upgrading

1. Production capacity doubled.

2. The failure rate is greatly reduced.

3. The parts replacement cycle is significantly extended.