Upgrading Projects
Project Background
The original production line had a high failure rate, low operating rate, and substandard production capacity.
Project Details
Project |
Upgrading of old production line |
|||||
Installation date |
05.2022 |
|||||
Design scale |
1500 t/h Finished size less than 10mm |
|||||
Workding hours |
20 hours/day |
|||||
Production process |
Three stages and one closed circuit crushing process |
|||||
Equipment list |
Process |
Equipment |
Before upgrading |
After upgrading |
||
Model |
Number |
Model |
Number |
|||
Middle crushing |
Single cylinder hydraulic cone crusher |
CC400-EC |
Three sets |
HC6800-EC |
Two sets |
|
HC870-MF |
One set |
|||||
Fine Crushing |
Single cylinder hydraulic cone crusher |
CC400-EF |
Six sets |
HC6800-EF |
Five sets |
|
HC870-EF |
Two sets |
After Upgrading
1. Production capacity doubled.
2. The failure rate is greatly reduced.
3. The parts replacement cycle is significantly extended.